Virginia solar and wind ordinances by county

27 counties with figures quoted from their own ordinances. 0 of 1 moratoria and bans on file in force. Plus the state law that applies.

Updated October 2026

Counties

Solar figures as each county's ordinance states them. Open a county for wind and battery storage rules, conditions, and the sentence each figure comes from.

Solar ordinance figures by county in Virginia
CountyRules readProperty lineHomesMax heightMin lotMoratorium or ban
Amherst CountySolar150 ftutility-scale solar generation facilitiesn/an/an/aNone on file
Campbell CountySolar150 ftlarge scale or community/shared solar energy facilitiesn/a20 ftground-mounted solar energy generation facilitiesn/aNone on file
Charlotte CountySolar75 ftUtility-Scale Solar Energy Systems400 ftUtility-Scale Solar Energy Systems25 ftground mounted Solar Energy Systems & equipmentn/aNone on file
Chesapeake citySolar150 ftAll other exterior property lines1,000 fton-site substation10 ftat max tiltn/aNone on file
Clarke CountySolarn/an/an/a20 acresNone on file
Cumberland CountySolar, Wind, Battery storage100 ft500 ft15 ftn/aNone on file
Essex CountySolar150 ftutility-scale solar facilities150 ftlarge-scale solar and PPA solar facilities10 ftlowest edge of photovoltaic panels2 acresutility-scale solar energy facilityNone on file
Fauquier CountySolar100 ftn/a15 ftn/aNone on file
Goochland CountySolar, Battery storage100 ft150 ft20 ftExcluding transmission utility poles serving the siten/aNone on file
Grayson CountySolar150 ft250 ft10 ftlowest edge of photovoltaic panels measured from finished graden/aNone on file
Greene CountySolar300 ftadjacent property linesn/a12 ftground-mounted solarn/aNone on file
Halifax CountySolarn/an/a20 ftn/aNone on file
King George CountySolarn/an/a15 ftground-mounted utility-scale solar2 acresutility-scale solarNone on file
King William CountySolar150 ftprincipal solar energy facilitiesn/a20 ftbuildings, structures, solar panel arrays or other equipmentn/aNone on file
Loudoun CountySolar, Battery storage25 ftgeneral standardsn/a20 ftgeneral standards500 acresGI zoning district, permitted useNone on file
Lunenburg CountySolar250 ftlarge-scale solar energy facilities450 ftresidential structures on non-project parcels15 ftsolar energy generation facilitiesn/aNone on file
Mecklenburg CountySolar150 ftutility-scale solar facilityn/a15 ftprimary structures and accessory buildings2 acresutility-scale solar facilityNot in force
Middlesex CountySolar, Battery storage100 ftRH Resource Husbandry districtn/an/an/aNone on file
Northampton CountySolar, Windn/an/an/an/aNone on file
Nottoway CountySolar, Battery storage300 ftfrom adjacent property lines1,200 ftfrom a habitable dwelling25 ftn/aNone on file
Page CountySolarn/an/a15 ftphotovoltaic panels, primary structures, battery storage systems and accessory buildings2 acresutility-scale solar facilityNone on file
Rockbridge CountySolar100 ftn/a12 ftfinished grade to the top of the solar paneln/aNone on file
Scott CountySolar100 ftUtility-Scale Solar Generation Facilitiesn/a20 ftUtility-Scale Solar Generation Facilitiesn/aNone on file
Southampton CountySolarn/a500 ftsubstations or connector stations18 ftsolar energy arrays when oriented at maximum tiltn/aNone on file
Surry CountySolar300 ftutility-scale projectsn/a18 ftGround-mounted solar energy generation facilitiesn/aNone on file
Sussex CountySolar150 ftutility-scale solar facility300 ftutility-scale solar facility15 ftother facility structures100 acresutility-scale solar facilityNone on file
Washington CountySolar50 ftnon-participating property100 ftinhabitant residence15 ftn/aNone on file

Every Virginia figure in one spreadsheet

238 figures from 32 counties, each with its quote, source, date read and any condition. 5 of those places are not on this site. Plus the moratorium or ban on file and Virginia state law.

CSV files that open in Excel or Google Sheets. No call required.

Moratoria and bans in Virginia

County, town and township moratoria and bans, each checked against the adopting document.

Solar and wind moratoria and bans in Virginia
PlaceTypeCoversStatusRuns toSource
Mecklenburg CountyBanUtility-scale solarRepealedJuly 1, 2026DocumentChecked September 29, 2026

Virginia state law

What state law says about local solar, wind and storage rules. Each statement links the law or official source it comes from.

State siting: Virginia Department of Environmental Quality; State Corporation Commission

Projects up to 150 MW can use a permit by rule from the Department of Environmental Quality. Larger ones may need a certificate from the State Corporation Commission. Local approval is also needed.

Va. Code Ann. 10.1-1197.5, 56-265.2 (DOE and Berkeley Lab inventory, June 2024). Source

Limits on local rules

For ground-mounted solar of 1 MW or more serving other property, counties must use a special exception or siting agreement whose setbacks, screening and height stay within state ranges; a county can still deny the application, and can depart from the ranges only by written agreement with the landowner and applicant.

Va. Code 15.2-2288.8(A) (2026 Acts cc. 1005, 1068). Source

What local government decides

Local governments set development standards and conditions for solar.

Va. Code Ann. 15.2-2288.7 (DOE and Berkeley Lab inventory, June 2024). Source

Solar standards in state law

Applies to ground-mounted solar of 1 MW or more that serves other property; each county must write its special-exception rules within these ranges (picking any number inside a range), may still deny a project, and may agree looser terms in a siting agreement.

Solar standards set by Virginia law
Homes (non-participating)150 to 200 ft
Schools, churches, community buildings150 to 200 ft
Public roads50 to 100 ft from roadbed edge
Property line (non-participating)50 to 75 ft
Wetlands and perennial streams50 ft (25 MW or less), 100 ft (over 25 MW)
Wetlands and streams in Chesapeake Bay Preservation Areas100 to 125 ft
Panel height at full tilt25 ft
Screening buffer width25 to 50 ft wide; plants need not exceed 3 ft at planting
Vegetative ground coverUp to 75% may be required
DecommissioningAgreement plus financial assurance; estimate updated every 5 years

Va. Code 15.2-2288.8(A) (2026 Acts cc. 1005, 1068); 15.2-2241.2. Source

Battery storage standards in state law

Batteries added inside the parcel of a solar project that already has a special exception are a permitted accessory use in every zoning district, with no further local land use approval, if storage capacity does not exceed the solar nameplate.

Battery storage standards set by Virginia law
Size allowed by right at an approved solar siteUp to 100% of solar nameplate

Va. Code 15.2-2316.10 (2026 Acts cc. 1011, 1076). Source

Screen sites across Virginia

Basepoint checks each parcel against these rules along with grid, land and environmental data, and keeps the source for every figure.