Nottoway County, Virginia solar and battery storage ordinance

Solar: 300 ft (from adjacent property lines) from property lines, 1,200 ft (from a habitable dwelling) from homes, 300 ft (from all public rights - of - way) from roads. Battery storage: 300 ft (from adjacent property lines) from property lines, 1,200 ft (from a habitable dwelling) from homes, 300 ft (from all public rights - of - way) from roads. Every figure is quoted from the county's ordinance, read September 29, 2026.

Updated September 2026

Solar rules

7 figures read from the county's ordinance, each with the sentence it comes from.

Solar rules in the Nottoway County ordinance
Rule and what the ordinance saysRequirement
Property line setbackfrom adjacent property linesa distance of at least three hundred (300) feet from adjacent property lines.300 ft
Setback from homesfrom a habitable dwelling(1,200) feet from a habitable dwelling1,200 ft
Road setbackfrom all public rights - of - wayThe project area shall be set back a distance of at least three hundred (300) feet from all public rights - of - way300 ft
Setback from perennial streamA buffer of at least 250 feet is required on either side of any perennial stream250 ft
Maximum heightGround - mounted Solar Energy generation and Battery Energy Storage facilities and equipment shall not exceed a height of twenty - five (25) feet25 ft
Fence heightThe Project Area shall be enclosed by security fencing not less than six (6) feet in height6 ft
Maximum project sizemedium-scale sites within the unincorporated areasThe total megawattage for all medium - scale sites within the entirety of the uninco rporated areas of the County shall not exceed 170 megawatts.170 MW

Source: Nottoway County ordinance (PDF), read September 29, 2026. Check the cited section with the county before relying on a figure.

Battery storage rules

6 figures read from the county's ordinance, each with the sentence it comes from.

Battery storage rules in the Nottoway County ordinance
Rule and what the ordinance saysRequirement
Property line setbackfrom adjacent property linesa distance of at least three hundred (300) feet from adjacent property lines.300 ft
Setback from homesfrom a habitable dwelling(1,200) feet from a habitable dwelling1,200 ft
Road setbackfrom all public rights - of - wayThe project area shall be set back a distance of at least three hundred (300) feet from all public rights - of - way300 ft
Setback from perennial streamA buffer of at least 250 feet is required on either side of any perennial stream250 ft
Maximum heightGround - mounted Solar Energy generation and Battery Energy Storage facilities and equipment shall not exceed a height of twenty - five (25) feet25 ft
Fence heightThe Project Area shall be enclosed by security fencing not less than six (6) feet in height6 ft

Source: Nottoway County ordinance (PDF), read September 29, 2026. Check the cited section with the county before relying on a figure.

More on Nottoway County in Basepoint

  • Which zoning districts allow solar in Nottoway County
  • Property line and road setbacks drawn on any parcel in Nottoway County as its buildable area
  • Transmission, substations, parcels and environmental layers for the same site
Book a demo

Virginia state law

State law can cap or override county rules. All Virginia rules and counties.

State siting: Virginia Department of Environmental Quality; State Corporation Commission

Projects up to 150 MW can use a permit by rule from the Department of Environmental Quality. Larger ones may need a certificate from the State Corporation Commission. Local approval is also needed.

Va. Code Ann. 10.1-1197.5, 56-265.2 (DOE and Berkeley Lab inventory, June 2024). Source

Limits on local rules

For ground-mounted solar of 1 MW or more serving other property, counties must use a special exception or siting agreement whose setbacks, screening and height stay within state ranges; a county can still deny the application, and can depart from the ranges only by written agreement with the landowner and applicant.

Va. Code 15.2-2288.8(A) (2026 Acts cc. 1005, 1068). Source

Solar standards in state law

Applies to ground-mounted solar of 1 MW or more that serves other property; each county must write its special-exception rules within these ranges (picking any number inside a range), may still deny a project, and may agree looser terms in a siting agreement.

Solar standards set by Virginia law
Homes (non-participating)150 to 200 ft
Schools, churches, community buildings150 to 200 ft
Public roads50 to 100 ft from roadbed edge
Property line (non-participating)50 to 75 ft
Wetlands and perennial streams50 ft (25 MW or less), 100 ft (over 25 MW)
Wetlands and streams in Chesapeake Bay Preservation Areas100 to 125 ft
Panel height at full tilt25 ft
Screening buffer width25 to 50 ft wide; plants need not exceed 3 ft at planting
Vegetative ground coverUp to 75% may be required
DecommissioningAgreement plus financial assurance; estimate updated every 5 years

Va. Code 15.2-2288.8(A) (2026 Acts cc. 1005, 1068); 15.2-2241.2. Source

Battery storage standards in state law

Batteries added inside the parcel of a solar project that already has a special exception are a permitted accessory use in every zoning district, with no further local land use approval, if storage capacity does not exceed the solar nameplate.

Battery storage standards set by Virginia law
Size allowed by right at an approved solar siteUp to 100% of solar nameplate

Va. Code 15.2-2316.10 (2026 Acts cc. 1011, 1076). Source

Every Virginia figure in one spreadsheet

238 figures from 32 counties, each with its quote, source, date read and any condition. 5 of those places are not on this site. Plus the moratorium or ban on file and Virginia state law.

CSV files that open in Excel or Google Sheets. No call required.

How these figures were read

We found Nottoway County's own ordinance and had two AI models read it separately. A figure is shown only when both read the same number and the sentence it comes from was found in the document. Moratoria and bans are checked against the adopting document. Ordinances change and many figures apply only in some cases, so check the cited section with the county before relying on one.

Common questions

What are the solar setbacks in Nottoway County, VA?

The county's ordinance sets solar facilities back 300 ft (from all public rights - of - way) from roads, 1,200 ft (from a habitable dwelling) from homes and 300 ft (from adjacent property lines) from property lines. Check the cited section with the county before relying on a figure.

How tall can a solar farm be in Nottoway County, VA?

The ordinance sets a maximum height of 25 ft. Check the cited section with the county before relying on a figure.

What are the battery storage setbacks in Nottoway County, VA?

The county's ordinance sets battery storage back 300 ft (from all public rights - of - way) from roads, 1,200 ft (from a habitable dwelling) from homes and 300 ft (from adjacent property lines) from property lines. Check the cited section with the county before relying on a figure.