King William County, Virginia solar ordinance

Solar: 150 ft (principal solar energy facilities) from property lines, 150 ft (principal solar energy facilities) from roads, 20 ft (buildings, structures, solar panel arrays or other equipment) maximum height. Every figure is quoted from the county's ordinance, read September 29, 2026.

Updated September 2026

Solar rules

7 figures read from the county's ordinance, each with the sentence it comes from.

Solar rules in the King William County ordinance
Rule and what the ordinance saysRequirement
Property line setbackprincipal solar energy facilitiesOne hundred fifty (150) feet from any property line or road.150 ft
Road setbackprincipal solar energy facilitiesOne hundred fifty (150) feet from any property line or road.150 ft
Setback from RPA wetlands, rivers, streams or other environmentally sensitive featuresprincipal solar energy facilitiesOne hundred (100) feet from RPA wetlands, rivers, streams or other environmentally sensitive features100 ft
Setback from wetland not associated with an RPAprincipal solar energy facilitiesand fifty (50) feet from any wetland not associated with an RPA.50 ft
Maximum heightbuildings, structures, solar panel arrays or other equipmentNo building, structures, solar panel arrays or other equipment utilized on site may exceed twenty (20) feet in height above finished grade.20 ft
Fence heightsecurity fencingSecurity fencing shall be limited to eight (8) feet in height.8 ft
Maximum project sizeUtility scale facilitiesUtility scale facilities may be no greater than one thousand (1,000) acres.1,000 acres

Source: King William County ordinance (PDF), read September 29, 2026. Check the cited section with the county before relying on a figure.

More on King William County in Basepoint

  • Which zoning districts allow solar in King William County
  • Property line and road setbacks drawn on any parcel in King William County as its buildable area
  • Transmission, substations, parcels and environmental layers for the same site
Book a demo

Virginia state law

State law can cap or override county rules. All Virginia rules and counties.

State siting: Virginia Department of Environmental Quality; State Corporation Commission

Projects up to 150 MW can use a permit by rule from the Department of Environmental Quality. Larger ones may need a certificate from the State Corporation Commission. Local approval is also needed.

Va. Code Ann. 10.1-1197.5, 56-265.2 (DOE and Berkeley Lab inventory, June 2024). Source

Limits on local rules

For ground-mounted solar of 1 MW or more serving other property, counties must use a special exception or siting agreement whose setbacks, screening and height stay within state ranges; a county can still deny the application, and can depart from the ranges only by written agreement with the landowner and applicant.

Va. Code 15.2-2288.8(A) (2026 Acts cc. 1005, 1068). Source

Solar standards in state law

Applies to ground-mounted solar of 1 MW or more that serves other property; each county must write its special-exception rules within these ranges (picking any number inside a range), may still deny a project, and may agree looser terms in a siting agreement.

Solar standards set by Virginia law
Homes (non-participating)150 to 200 ft
Schools, churches, community buildings150 to 200 ft
Public roads50 to 100 ft from roadbed edge
Property line (non-participating)50 to 75 ft
Wetlands and perennial streams50 ft (25 MW or less), 100 ft (over 25 MW)
Wetlands and streams in Chesapeake Bay Preservation Areas100 to 125 ft
Panel height at full tilt25 ft
Screening buffer width25 to 50 ft wide; plants need not exceed 3 ft at planting
Vegetative ground coverUp to 75% may be required
DecommissioningAgreement plus financial assurance; estimate updated every 5 years

Va. Code 15.2-2288.8(A) (2026 Acts cc. 1005, 1068); 15.2-2241.2. Source

Every Virginia figure in one spreadsheet

238 figures from 32 counties, each with its quote, source, date read and any condition. 5 of those places are not on this site. Plus the moratorium or ban on file and Virginia state law.

CSV files that open in Excel or Google Sheets. No call required.

How these figures were read

We found King William County's own ordinance and had two AI models read it separately. A figure is shown only when both read the same number and the sentence it comes from was found in the document. Moratoria and bans are checked against the adopting document. Ordinances change and many figures apply only in some cases, so check the cited section with the county before relying on one.

Common questions

What are the solar setbacks in King William County, VA?

The county's ordinance sets solar facilities back 150 ft (principal solar energy facilities) from property lines and 150 ft (principal solar energy facilities) from roads. Check the cited section with the county before relying on a figure.

How tall can a solar farm be in King William County, VA?

The ordinance sets a maximum height of 20 ft (buildings, structures, solar panel arrays or other equipment). Check the cited section with the county before relying on a figure.