Fauquier County, Virginia solar ordinance

Solar: 100 ft from property lines, 1,000 ft from roads, 15 ft maximum height. Every figure is quoted from the county's ordinance, read September 30, 2026.

Updated September 2026

Solar rules

6 figures read from the county's ordinance, each with the sentence it comes from.

Solar rules in the Fauquier County ordinance
Rule and what the ordinance saysRequirement
Property line setbackThe following additional minimum setbacks shall apply from all solar equipment: a. 100’ setback to the project boundary.100 ft
Road setbackSolar equipment and panels shall be set back a distance of 1,000 feet from a right-of-way line of a street identified as a Corridor of Statewide Significance.1,000 ft
Maximum heightSolar panels shall not exceed fifteen (15) feet in height measured from existing grade below the panel15 ft
Fence heightAll property containing panels shall be enclosed with chain link fencing not less than six (6) feet in height, topped with an appropriate anti-climbing device, and secured with gates.6 ft
Maximum lot coverageSolar panels shall not cover more than 80% of the project area.80%
Maximum project sizeThe maximum project size for individual Utility Scale Solar projects shall not exceed one thousand (1,000) acres.1,000 acres

Source: Fauquier County ordinance (PDF), read September 30, 2026. Check the cited section with the county before relying on a figure.

More on Fauquier County in Basepoint

  • Property line and road setbacks drawn on any parcel in Fauquier County as its buildable area
  • Transmission, substations, parcels and environmental layers for the same site
Book a demo

Virginia state law

State law can cap or override county rules. All Virginia rules and counties.

State siting: Virginia Department of Environmental Quality; State Corporation Commission

Projects up to 150 MW can use a permit by rule from the Department of Environmental Quality. Larger ones may need a certificate from the State Corporation Commission. Local approval is also needed.

Va. Code Ann. 10.1-1197.5, 56-265.2 (DOE and Berkeley Lab inventory, June 2024). Source

Limits on local rules

For ground-mounted solar of 1 MW or more serving other property, counties must use a special exception or siting agreement whose setbacks, screening and height stay within state ranges; a county can still deny the application, and can depart from the ranges only by written agreement with the landowner and applicant.

Va. Code 15.2-2288.8(A) (2026 Acts cc. 1005, 1068). Source

Solar standards in state law

Applies to ground-mounted solar of 1 MW or more that serves other property; each county must write its special-exception rules within these ranges (picking any number inside a range), may still deny a project, and may agree looser terms in a siting agreement.

Solar standards set by Virginia law
Homes (non-participating)150 to 200 ft
Schools, churches, community buildings150 to 200 ft
Public roads50 to 100 ft from roadbed edge
Property line (non-participating)50 to 75 ft
Wetlands and perennial streams50 ft (25 MW or less), 100 ft (over 25 MW)
Wetlands and streams in Chesapeake Bay Preservation Areas100 to 125 ft
Panel height at full tilt25 ft
Screening buffer width25 to 50 ft wide; plants need not exceed 3 ft at planting
Vegetative ground coverUp to 75% may be required
DecommissioningAgreement plus financial assurance; estimate updated every 5 years

Va. Code 15.2-2288.8(A) (2026 Acts cc. 1005, 1068); 15.2-2241.2. Source

Every Virginia figure in one spreadsheet

238 figures from 32 counties, each with its quote, source, date read and any condition. 5 of those places are not on this site. Plus the moratorium or ban on file and Virginia state law.

CSV files that open in Excel or Google Sheets. No call required.

How these figures were read

We found Fauquier County's own ordinance and had two AI models read it separately. A figure is shown only when both read the same number and the sentence it comes from was found in the document. Moratoria and bans are checked against the adopting document. Ordinances change and many figures apply only in some cases, so check the cited section with the county before relying on one.

Common questions

What are the solar setbacks in Fauquier County, VA?

The county's ordinance sets solar facilities back 100 ft from property lines and 1,000 ft from roads. Check the cited section with the county before relying on a figure.

How tall can a solar farm be in Fauquier County, VA?

The ordinance sets a maximum height of 15 ft. Check the cited section with the county before relying on a figure.