Morrison County, Minnesota solar and wind moratorium
Morrison County has a moratorium in force since May 5, 2026, running to May 5, 2027. It covers community solar, solar farms and wind.
Updated September 2026
Moratorium
Community solar, solar farms and wind
- Adopted
- May 5, 2026
- Runs to
- May 5, 2027
- Scope
- applies where the county has zoning jurisdiction (not inside cities that zone for themselves)
- Checked
- September 29, 2026
Imposing a moratorium on community solar energy, solar farms, and wind energy conversion systems.
Minnesota state law
State law can cap or override county rules. All Minnesota rules and counties.
State siting: Minnesota Public Utilities Commission
A state site permit is needed for solar of 50 MW or more, wind of 5 MW or more and storage of 10 MW or more; the developer may instead seek local approval for solar under 80 MW, wind under 25 MW and any storage.
Minn. Stat. 216I.02 subd. 6, 11, 17, 18; 216I.08; 216I.10 (2024 permitting reform). Source
Limits on local rules
A state site permit overrides county and town zoning for projects of 50 MW or more; no limit was found for smaller projects.
Minn. Stat. 216I.18. Source
Solar standards in state law
Statewide noise limits apply to every noise source, so they bind solar arrays whether the state or a county permits it; no statewide setback figures were found.
| Noise | 50 dBA L50 night, 60 dBA L50 day (residential) |
Minn. R. 7030.0040. Source
Wind standards in state law
Statewide noise limits apply to every noise source, so they bind wind turbines whether the state or a county permits it; no statewide setback figures were found.
| Noise | 50 dBA L50 night, 60 dBA L50 day (residential) |
Minn. R. 7030.0040. Source
Battery storage standards in state law
Statewide noise limits apply to every noise source, so they bind battery storage whether the state or a county permits it; no statewide setback figures were found.
| Noise | 50 dBA L50 night, 60 dBA L50 day (residential) |
Minn. R. 7030.0040. Source
Every Minnesota figure in one spreadsheet
158 figures from 30 counties, each with its quote, source, date read and any condition. 10 of those places are not on this site. Plus the 2 moratoria and bans on file and Minnesota state law.
How these figures were read
Moratoria and bans are checked against the adopting document. Ordinances change and many figures apply only in some cases, so check the cited section with the county before relying on one.
Common questions
Is there a solar and wind moratorium in Morrison County, MN?
Morrison County has a moratorium in force since May 5, 2026, running to May 5, 2027. It covers community solar, solar farms and wind. Checked against the adopting document on September 29, 2026.