Morrison County, Minnesota solar and wind moratorium

Morrison County has a moratorium in force since May 5, 2026, running to May 5, 2027. It covers community solar, solar farms and wind.

Updated September 2026

Moratorium

Moratorium in force

Community solar, solar farms and wind

Adopted
May 5, 2026
Runs to
May 5, 2027
Scope
applies where the county has zoning jurisdiction (not inside cities that zone for themselves)
Checked
September 29, 2026
Imposing a moratorium on community solar energy, solar farms, and wind energy conversion systems.

Adopting document

More on Morrison County in Basepoint

  • Moratoria and local rules flagged on the parcels you screen
  • Transmission, substations, parcels and environmental layers for the same site
Book a demo

Minnesota state law

State law can cap or override county rules. All Minnesota rules and counties.

State siting: Minnesota Public Utilities Commission

A state site permit is needed for solar of 50 MW or more, wind of 5 MW or more and storage of 10 MW or more; the developer may instead seek local approval for solar under 80 MW, wind under 25 MW and any storage.

Minn. Stat. 216I.02 subd. 6, 11, 17, 18; 216I.08; 216I.10 (2024 permitting reform). Source

Limits on local rules

A state site permit overrides county and town zoning for projects of 50 MW or more; no limit was found for smaller projects.

Minn. Stat. 216I.18. Source

Solar standards in state law

Statewide noise limits apply to every noise source, so they bind solar arrays whether the state or a county permits it; no statewide setback figures were found.

Solar standards set by Minnesota law
Noise50 dBA L50 night, 60 dBA L50 day (residential)

Minn. R. 7030.0040. Source

Wind standards in state law

Statewide noise limits apply to every noise source, so they bind wind turbines whether the state or a county permits it; no statewide setback figures were found.

Wind standards set by Minnesota law
Noise50 dBA L50 night, 60 dBA L50 day (residential)

Minn. R. 7030.0040. Source

Battery storage standards in state law

Statewide noise limits apply to every noise source, so they bind battery storage whether the state or a county permits it; no statewide setback figures were found.

Battery storage standards set by Minnesota law
Noise50 dBA L50 night, 60 dBA L50 day (residential)

Minn. R. 7030.0040. Source

Every Minnesota figure in one spreadsheet

158 figures from 30 counties, each with its quote, source, date read and any condition. 10 of those places are not on this site. Plus the 2 moratoria and bans on file and Minnesota state law.

CSV files that open in Excel or Google Sheets. No call required.

How these figures were read

Moratoria and bans are checked against the adopting document. Ordinances change and many figures apply only in some cases, so check the cited section with the county before relying on one.

Common questions

Is there a solar and wind moratorium in Morrison County, MN?

Morrison County has a moratorium in force since May 5, 2026, running to May 5, 2027. It covers community solar, solar farms and wind. Checked against the adopting document on September 29, 2026.