Washington County, Maryland solar ordinance

Solar: 150 ft (PI, AP districts adjacent to expressway/highway) from roads, 20 acres minimum lot, 55 dBA (measured from property line of adjacent dwelling) noise limit. Every figure is quoted from the county's ordinance, read September 30, 2026.

Updated September 2026

Solar rules

3 figures read from the county's ordinance, each with the sentence it comes from.

Solar rules in the Washington County ordinance
Rule and what the ordinance saysRequirement
Road setbackPI, AP districts adjacent to expressway/highwayA front yard adjacent to an expressway or primary highway as shown on the Washington County Highway Plan shall be one hundred fifty (150) feet.150 ft
Minimum lot sizeMinimum Lot Size. No such generating system shall be erected on any lot less than twenty acres in size.20 acres
Noise limitmeasured from property line of adjacent dwellingAudible sound due to Solar Energy Generating System operations shall not exceed fifty-five (55) dBA for any period of time, when measured from the property line of any adjacent property improved with a dwelling unit at the time of the issuance of the zoning certificate.55 dBA

Source: Washington County ordinance (PDF), read September 30, 2026. Check the cited section with the county before relying on a figure.

More on Washington County in Basepoint

  • Which zoning districts allow solar in Washington County
  • Property line and road setbacks drawn on any parcel in Washington County as its buildable area
  • Transmission, substations, parcels and environmental layers for the same site
Book a demo

Maryland state law

State law can cap or override county rules. All Maryland rules and counties.

State siting: Maryland Public Service Commission

Solar over 2 MW needs a Public Service Commission certificate or approval before construction.

Public Utilities Article 7-207, 7-207.1, 7-207.4, 7-218. Source

Limits on local rules

Counties and towns cannot ban solar of more than 1 MW or deny a site plan that meets the state standards, with some exceptions.

Public Utilities Article 7-218(h) (Renewable Energy Certainty Act, Ch. 624 of 2025). Source

Solar standards in state law

Applies to ground-mounted solar over 1 MW (AC) that sells wholesale, is community solar or is aggregate net metered; the owner must meet these figures, and a county or town may not ban such solar or deny a site plan that meets them. A siting agreement with the county may set looser terms; agrivoltaics are exempt from the figures.

Solar standards set by Maryland law
Homes (non-participating)150 ft
Property line (non-participating)100 ft
Fence height20 ft max, no barbed wire
Public roads50 ft (fence from road right-of-way)
Panel height (average)15 ft average
Screening buffer width35 ft max
BermsCounty may not require
DecommissioningBond up to 125% of cost, with the PSC

Md. Code, Public Utilities 7-218(b), (f), (g), (h) (Renewable Energy Certainty Act, Ch. 623 of 2025). Source

Every Maryland figure in one spreadsheet

79 figures from 11 counties and 1 town or township, each with its quote, source, date read and any condition. 1 of those places is not on this site. Plus Maryland state law.

CSV files that open in Excel or Google Sheets. No call required.

How these figures were read

We found Washington County's own ordinance and had two AI models read it separately. A figure is shown only when both read the same number and the sentence it comes from was found in the document. Moratoria and bans are checked against the adopting document. Ordinances change and many figures apply only in some cases, so check the cited section with the county before relying on one.

Common questions

What are the solar setbacks in Washington County, MD?

The county's ordinance sets solar facilities back 150 ft (PI, AP districts adjacent to expressway/highway) from roads. Check the cited section with the county before relying on a figure.

What is the minimum lot size for a solar farm in Washington County, MD?

The ordinance sets a minimum lot size of 20 acres. Check the cited section with the county before relying on a figure.