Allegany County, Maryland solar and wind ordinance

Solar: 30 ft (minimum all-around setback) from property lines. Wind: 1 × height (IWECS with a height less than 200 feet) from property lines, 2,000 ft from homes. Every figure is quoted from the county's ordinance, read September 30, 2026.

Updated September 2026

Solar rules

1 figure read from the county's ordinance, each with the sentence it comes from.

Solar rules in the Allegany County ordinance
Rule and what the ordinance saysRequirement
Property line setbackminimum all-around setbackC. The minimum all-around setback for the solar energy system is 30 feet or the fire separation distance, whichever is greater.30 ft

Source: Allegany County ordinance (PDF), read September 30, 2026. Check the cited section with the county before relying on a figure.

Wind rules

9 figures read from the county's ordinance, each with the sentence it comes from.

Wind rules in the Allegany County ordinance
Rule and what the ordinance saysRequirement
Property line setbackIWECS with a height less than 200 feet(1) Each individual IWECS with a height less than 200 feet shall observe a minimum setback distance equal to no less than 1.0 times the height of the unit.1 × height
Property line setbackIWECS with a height greater than 200 feet, but less than 300 feet(2) Each individual IWECS with a height greater than 200 feet, but less than 300 feet, shall observe a minimum setback distance equal to no less than 2.0 times the height of the unit.2 × height
Property line setbackIWECS with a height greater than 300 feet(3) Each individual IWECS with a height greater than 300 feet shall observe a minimum setback distance equal to no less than 3.0 times the height of the unit.3 × height
Setback from homes(2) Two thousand feet from any residential structure.2,000 ft
Setback from structure not the property of the applicantstructure includes no less than 600 square feet of occupiable space(1) One thousand feet from any structure not the property of the applicant, provided that the structure includes no less than 600 square feet of occupiable space.1,000 ft
Setback from schools(3) Five thousand feet from all schools.5,000 ft
Setback from site listed on the National Register of Historic Places(4) Five thousand feet from any site listed on the National Register of Historic Places.5,000 ft
Setback from habitats of rare, threatened, or endangered species(5) One thousand feet from the habitats of rare, threatened, or endangered (RTE) species as delineated on the Department of Natural Resources (DNR), Heritage Division, Environmentally Significant Areas (ESAs) maps.1,000 ft
Decommissioning bondfor each wind energy device to be erected(6) A bond equal to 100% of the above-referenced cost estimate shall be posted by the applicant for each wind energy device to be erected, and no permit shall be issued until such bond is posted.100%

Source: Allegany County ordinance (PDF), read September 30, 2026. Check the cited section with the county before relying on a figure.

More on Allegany County in Basepoint

  • Which zoning districts allow solar in Allegany County
  • Property line and road setbacks drawn on any parcel in Allegany County as its buildable area
  • Transmission, substations, parcels and environmental layers for the same site
Book a demo

Maryland state law

State law can cap or override county rules. All Maryland rules and counties.

State siting: Maryland Public Service Commission

Solar over 2 MW needs a Public Service Commission certificate or approval before construction.

Public Utilities Article 7-207, 7-207.1, 7-207.4, 7-218. Source

Limits on local rules

Counties and towns cannot ban solar of more than 1 MW or deny a site plan that meets the state standards, with some exceptions.

Public Utilities Article 7-218(h) (Renewable Energy Certainty Act, Ch. 624 of 2025). Source

Solar standards in state law

Applies to ground-mounted solar over 1 MW (AC) that sells wholesale, is community solar or is aggregate net metered; the owner must meet these figures, and a county or town may not ban such solar or deny a site plan that meets them. A siting agreement with the county may set looser terms; agrivoltaics are exempt from the figures.

Solar standards set by Maryland law
Homes (non-participating)150 ft
Property line (non-participating)100 ft
Fence height20 ft max, no barbed wire
Public roads50 ft (fence from road right-of-way)
Panel height (average)15 ft average
Screening buffer width35 ft max
BermsCounty may not require
DecommissioningBond up to 125% of cost, with the PSC

Md. Code, Public Utilities 7-218(b), (f), (g), (h) (Renewable Energy Certainty Act, Ch. 623 of 2025). Source

Every Maryland figure in one spreadsheet

79 figures from 11 counties and 1 town or township, each with its quote, source, date read and any condition. 1 of those places is not on this site. Plus Maryland state law.

CSV files that open in Excel or Google Sheets. No call required.

How these figures were read

We found Allegany County's own ordinance and had two AI models read it separately. A figure is shown only when both read the same number and the sentence it comes from was found in the document. Moratoria and bans are checked against the adopting document. Ordinances change and many figures apply only in some cases, so check the cited section with the county before relying on one.

Common questions

What are the solar setbacks in Allegany County, MD?

The county's ordinance sets solar facilities back 30 ft (minimum all-around setback) from property lines. Check the cited section with the county before relying on a figure.

What are the wind turbine setbacks in Allegany County, MD?

The county's ordinance sets wind turbines back 2,000 ft from homes, 1 × height (IWECS with a height less than 200 feet) from property lines, 2 × height (IWECS with a height greater than 200 feet, but less than 300 feet) from property lines and 3 × height (IWECS with a height greater than 300 feet) from property lines. Check the cited section with the county before relying on a figure.