Cuming County, Nebraska solar and wind ordinance

Solar: 12 ft (commercial solar conversion systems array average height) maximum height. Wind: 2,000 ft (commercial/utility WECS from neighboring dwelling units) from homes, 1.5 × height (commercial/utility WECS from road rights-of-way) from roads. Every figure is quoted from the county's ordinance, read September 29, 2026.

Updated September 2026

Solar rules

4 figures read from the county's ordinance, each with the sentence it comes from.

Solar rules in the Cuming County ordinance
Rule and what the ordinance saysRequirement
Property line setbackcommercial solar conversion systems side and rear setback abutting a residential use or residential zoning districtA thirty - foot side and rear setback shall apply only to the setback area measured from a lot line that abuts a residential use or residential zoning district.30 ft
Maximum heightcommercial solar conversion systems array average heightHeight: The average height of the solar panel arrays shall not exceed 12 feet.12 ft
Fence heightcommercial solar conversion systemsfencing up to eight feet in height is permitted8 ft
Maximum lot coveragecommercial solar conversion systems enclosed buildings and structuresLot coverage: No more than one percent of the gross site area shall be occupied by enclosed buildings and structures.1%

Source: Cuming County ordinance (PDF), read September 29, 2026. Check the cited section with the county before relying on a figure.

Wind rules

7 figures read from the county's ordinance, each with the sentence it comes from.

Wind rules in the Cuming County ordinance
Rule and what the ordinance saysRequirement
Setback from homescommercial/utility WECS from neighboring dwelling unitsNeighboring Dwelling Units* 2,000 ft.2,000 ft
Road setbackcommercial/utility WECS from road rights-of-wayRoad Rights - of - Way** 1.5 times the total height1.5 × height
Setback from other rights-of-waycommercial/utility WECSOther Rights - of - Way 1.5 times the total height1.5 × height
Setback from public conservation landscommercial/utility WECSPublic Conservation Lands 1.5 times the total height1.5 × height
Setback from wetlandscommercial/utility WECSWetlands, US FW Types III, IV, and V 1.5 times the total height1.5 × height
Setback from river bluffscommercial/utility WECS from river bluffs of over 15 feetRiver Bluffs of over 15 feet One times the total height1 × height
Noise limitcommercial/utility WECS at the nearest structure occupied by humansNo Commercial/Utility WECS shall exceed 50 dBA at the nearest structure occupied by humans.50 dBA

Source: Cuming County ordinance (PDF), read September 29, 2026. Check the cited section with the county before relying on a figure.

More on Cuming County in Basepoint

  • Which zoning districts allow solar in Cuming County
  • Property line and road setbacks drawn on any parcel in Cuming County as its buildable area
  • Transmission, substations, parcels and environmental layers for the same site
Book a demo

Nebraska state law

State law can cap or override county rules. All Nebraska rules and counties.

State siting: Nebraska Power Review Board

New generation needs Power Review Board approval, but privately developed renewable projects are exempt if they file a request with the board before building.

Neb. Rev. Stat. 70-1012, 70-1014.02 (DOE and Berkeley Lab inventory, June 2024). Source

Every Nebraska figure in one spreadsheet

189 figures from 23 counties, each with its quote, source, date read and any condition. 1 of those places is not on this site. Plus the 8 moratoria and bans on file and Nebraska state law.

CSV files that open in Excel or Google Sheets. No call required.

How these figures were read

We found Cuming County's own ordinance and had two AI models read it separately. A figure is shown only when both read the same number and the sentence it comes from was found in the document. Moratoria and bans are checked against the adopting document. Ordinances change and many figures apply only in some cases, so check the cited section with the county before relying on one.

Common questions

What are the solar setbacks in Cuming County, NE?

The county's ordinance sets solar facilities back 30 ft (commercial solar conversion systems side and rear setback abutting a residential use or residential zoning district) from property lines. Check the cited section with the county before relying on a figure.

How tall can a solar farm be in Cuming County, NE?

The ordinance sets a maximum height of 12 ft (commercial solar conversion systems array average height). Check the cited section with the county before relying on a figure.

What are the wind turbine setbacks in Cuming County, NE?

The county's ordinance sets wind turbines back 2,000 ft (commercial/utility WECS from neighboring dwelling units) from homes and 1.5 × height (commercial/utility WECS from road rights-of-way) from roads. Check the cited section with the county before relying on a figure.