Riverside County, California solar and wind ordinance

Solar: 10 ft (W-E Zone) from property lines, 10 acres (Solar power plant) minimum lot. Wind: 400 ft (Commercial WECS in W-1 zone) maximum height, 60 dBA (Commercial WECS operations) noise limit. Every figure is quoted from the county's ordinance, read September 29, 2026.

Updated September 2026

Solar rules

2 figures read from the county's ordinance, each with the sentence it comes from.

Solar rules in the Riverside County ordinance
Rule and what the ordinance saysRequirement
Property line setbackW-E Zone5. No solar power plants shall be closer than 10 feet from any lot line.10 ft
Minimum lot sizeSolar power plant19. Solar power plants on a lot 10 acres or larger.10 acres

Source: Riverside County ordinance (PDF), read September 29, 2026. Check the cited section with the county before relying on a figure.

Wind rules

3 figures read from the county's ordinance, each with the sentence it comes from.

Wind rules in the Riverside County ordinance
Rule and what the ordinance saysRequirement
Maximum heightCommercial WECS in W-1 zoneNo commercial WECS shall exceed four hundred (400') feet in height.400 ft
Maximum heightCommercial WECS in W-E zone1. No commercial WECS shall exceed 500 feet in height.500 ft
Noise limitCommercial WECS operations1) Unless the conditions of approval provide a more restrictive standard, a commercial WECS or WECS array shall not be operated so that noise is created exceeding 60 dB(A)60 dBA

Source: Riverside County ordinance (PDF), read September 29, 2026. Check the cited section with the county before relying on a figure.

More on Riverside County in Basepoint

  • Which zoning districts allow solar in Riverside County
  • Property line and road setbacks drawn on any parcel in Riverside County as its buildable area
  • Transmission, substations, parcels and environmental layers for the same site
Book a demo

California state law

State law can cap or override county rules. All California rules and counties.

State siting: California Energy Commission (Opt-In Certification Program)

A developer of solar or wind of 50 MW or more, or storage of 200 MWh or more, may choose state certification from the Energy Commission instead of county permits, applying by June 30, 2030; otherwise county rules apply.

Pub. Resources Code 25545, 25545.1 (AB 205, 2022). Source

Limits on local rules

If the developer opts in, the state certificate replaces local permits and overrides local ordinances; otherwise county rules apply.

Pub. Resources Code 25545.1(b). Source

Every California figure in one spreadsheet

33 figures from 9 counties, each with its quote, source, date read and any condition. 5 of those places are not on this site. Plus California state law.

CSV files that open in Excel or Google Sheets. No call required.

How these figures were read

We found Riverside County's own ordinance and had two AI models read it separately. A figure is shown only when both read the same number and the sentence it comes from was found in the document. Moratoria and bans are checked against the adopting document. Ordinances change and many figures apply only in some cases, so check the cited section with the county before relying on one.

Common questions

What are the solar setbacks in Riverside County, CA?

The county's ordinance sets solar facilities back 10 ft (W-E Zone) from property lines. Check the cited section with the county before relying on a figure.

What is the minimum lot size for a solar farm in Riverside County, CA?

The ordinance sets a minimum lot size of 10 acres (Solar power plant). Check the cited section with the county before relying on a figure.